Gemin

Red flags in a website quote

Six things that mean the number will change later, and the questions that surface them before you sign.

Gemin Pak Hiring

Summarize with AI

What is in this

Two quotes for the same project can differ by a factor of three, and the cheaper one is often cheaper because it is for less work. Not dishonestly: it genuinely does not include things the expensive one does, and nothing on either document says so.

These are the six omissions I would look for. Each one is a place where a number changes later, and each has a question that surfaces it in a sentence.

1. No mention of redirects

The most common and the most expensive.

If a quote for moving an existing site says nothing about URLs, the work is not in it. That is not a small line item on a site with history: it is building the map from analytics rather than a crawl, deciding what happens to every address, compressing the structural moves into patterns, and verifying the lot after launch.

The question: "How did you count the URLs, and what is the number?" Somebody who has done this has a number, and it came from Search Console rather than the navigation. Redirect mapping is what the answer should sound like.

2. Integrations priced as one line

"CRM integration" covers two jobs that differ by a week.

The cheap one is embedding a form the CRM provides. The expensive one is a native form posting to an API, with fields mapped, campaign attribution carried through, and a defined behavior when the write fails. Both are honestly described as "connect the CRM", and only one of them survives a marketing team asking which campaign produced the leads.

The question: "When a submission fails, what happens?" If the answer is that it does not fail, the failure path has not been built, and you will find out which quote you bought about a month in.

3. No change-order trigger

Every project changes. The quotes worth trusting say in advance what counts as a change.

A quote with no such clause is not a quote with no change orders. It is a quote where the conversation about them happens later, with the work half done and the leverage all on one side. That conversation goes badly regardless of who is right.

The question: "What specifically would make this number go up?" A good answer is concrete and short: more templates than the four listed, content arriving later than the agreed date, a platform that turns out to have no export. An answer of "nothing, this is fixed" is either an unusually careful scope or an unusually optimistic one, and it is worth knowing which.

4. A timeline that ignores copy

A build plan that runs design, development and launch with no content milestone has quietly assumed the content exists.

It rarely does. The most common cause of a late website is not development: it is nine pages waiting on copy that nobody was assigned to write. A timeline that does not name a content deadline has not planned for the thing most likely to move it.

The question: "What is the last date content can arrive without moving the launch?" Anyone who has shipped a site has that date. It is one of the first things they will tell you.

5. No named person

Relevant when you are buying from a company rather than an individual.

You were sold by somebody. The question is whether that person is doing the work, and it is a fair question rather than an accusation: senior people cannot build every project, and that is normal. What is not fine is not knowing.

The question: "Who is building this, and what else are they on during these weeks?" The second half matters more than the first.

6. A number with no shape

A quote that is one figure with a paragraph under it has told you almost nothing.

A quote you can evaluate is broken into parts: the templates, the content work, the migration, the integrations, the things explicitly excluded. Not so you can haggle each line, but because the breakdown is what lets you compare two quotes at all, and because the act of writing it is what makes somebody notice they forgot the redirects.

The question: "What is in this that would not be in a cheaper version?" The answer is where the two quotes on your desk actually differ.

The list to work through

Take this with you

Questions to ask about a website quote

Six questions, and the answers tell you which of two quotes is cheaper because it is for less work.

  1. How did you count the URLs, and what is the number?

    A migration quote priced on the page count misses the archive, which is usually several times larger.

    Worry if you hear We will set up redirects as needed.

  2. For each integration: embed, or built and mapped?

    These are different weeks of work and they are described by the same phrase.

    Worry if you hear We will connect your CRM.

  3. When a form submission fails, what happens?

    A failure path that has not been designed is a failure path that does not exist.

    Worry if you hear It will not fail.

  4. What specifically would make this number go up?

    Every project changes. You want that conversation now, not with the work half finished.

    Worry if you hear Nothing, the price is fixed.

  5. What is the last date content can arrive without moving the launch?

    Late copy is the most common cause of a late site, and a timeline without a content milestone has not planned for it.

    Worry if you hear We will work around your content.

  6. Who is building this, and what else are they on in those weeks?

    Being sold by one person and delivered by another is normal. Not knowing which is not.

  7. What is in this quote that would not be in a cheaper one?

    It is the fastest way to find where two quotes for the same project actually differ.

None of these is a trap and none of them requires knowing anything technical. A good answer takes a sentence, and a bad one is obvious immediately, which is the whole point of asking them before you sign rather than discovering them afterwards.

What a Webflow migration costs covers what moves the number in the first place, and how to choose a Webflow developer is the stage before this one.

Reach out and see if we are a good fit.

Start a project

Currently booking two to four weeks out.